ORGANIZATION OF ELECTRICAL ENERGY CALCULATION, WHICH WAS USED FOR THE SUBSTATION DEMANDS
Abstract
Have the question about the possibility of usage of multifunctional electronic meters of electrical energy calculation of the three wire high voltage networks 10(6)kV in automatic system dispatching points for electro energy calculation (power) which used for the substation demands 110(35)/10(6)kV on the side 0,4(0,23) кV calculation.Downloads
How to Cite
Момот, В. В., & Рой, В. Ф. (2013). ORGANIZATION OF ELECTRICAL ENERGY CALCULATION, WHICH WAS USED FOR THE SUBSTATION DEMANDS. Lighting Engineering & Power Engineering, (1), 17–23. Retrieved from https://lepe.kname.edu.ua/index.php/lepe/article/view/209
Issue
Section
Articles
License
The authors that are published in this journal agree with the following terms:
- The authors reserve the right of authorship of his work and pass to the journal the right of first publication of this work is licensed under a Creative Commons Attribution License, which allows others to freely distribute published work with reference to authors of original works and works first published in this journal.
- The authors have the right to enter into a separate additional agreement for non-exclusive distribution of work in the form in which it was published in the magazine (for example, to place work in electronic storage agencies or publish as part of the monograph), providing the reference to the first publication in this journal.
- Journal policy allows and encourages the placement by the authors on the Internet (eg, in storage facilities or personal websites) the manuscript of the works before the submission of the manuscript to the editor as well as during its editorial processing, as it contributes to productive scientific discussion and has a positive impact on efficiency and dynamics citing published work (see. The Effect of Open Access).